About Project

The IPA 2013 Energy Efficiency in Thermal Power Generation Facilities project has successfully built a real-time performance monitoring system that can detect the loss of performance in thermal power plants over time. The project also conducted an assessment study for each unit of the thermal power plants included within the scope of the project.